SHOP notes:
- The masking legs need to be adjusted so they hang perpendicular.
- the "BOYZ" sign appears to be tipping down on the STAR side
- ALTAR keeps flapping in the breeze of the AC vent; perhaps it can be attached to the BOYZ sign
- For discussion with Dave, Patrick and Gene: would the traveller look better FLAT, or FULL? "Fullness" needs to be evened out, if we're going that way.
- The step units at the aisles are looking very tired; repaint, and do something about the hole in the carpet (replace carpet, or remove entirely)
- Pull up loose chain ends
- SLIDES: remove all animation/transition effects from the "big drop" sequence.
- repaint floor; maybe consider a stain finish for a darker look than the matte?
PROP notes:
- Paint STOOLS gloss black
- Paint Eric's Piano Stand gloss black
- Still waiting on sprinkler
- Still looking for larger water bottles
- Hot pot for dry ice - use one from PRODUCTION OFFICE
- KC will pick up dry ice for run of show; he'll be picking up first load on Tuesday.
- CRASH BOX.
Overall, it was a very good run through; the actors are ready for an audience, although we're still cleaning up sound and lights.
No comments:
Post a Comment