2007/11/15

Production Meeting Notes Nov 15

MMC -
There will be a MMC "stumble" thru for Patrick on Sunday at about 4pm. Patrick and Daniela will then meet afterwards to discuss the lighting design for the show.

Patrick and Chris and Gene will meet on the MMC set after the meeting to discuss placement of the picture frame; it must be far enought US to make room for acting, but far enough DS so lights don't wash out the projection.

MMC Rehearsal will move into the Balcony on Friday morning. Gene has already begun moving Madeline's Christmas out.

The Pouf and Bench need some attention; we should have Ellis look at them.
Gaby will get fabric samples to Ellis so he can find material for the dust ruffle. Same fabric will also be used on headboard and to cover 2 small pillows to help tie in the new elements.

We still need to find a mirror. Gaby will re-paint the bedside tables to bring them more in line with the design concept for this show. Need to get black tule to drape over the mirror.

M's C:
Earl still needs a BS tech. DP has turned us down, and Earl's 1st option isn't available.

GENERAL:
Duet dryer needs service: it's overheating. ML did clear some line from behind the filter, need to check hose and outlet, too.

There is a RENTAL on the Mainstage after the M's C performance on December 1. It plays DS of the 2nd portal: we need to setup the screen for RP. They are bringing sound gear, furniture, projector, and source. They setup at 4:00, dress tech at 6:30, 8:30 curtain.

No comments: