The work has begun on phase III-c renovations.
Kelly Benson Electrical will be replacing the lights in the poster cases, repairing lights in the 2nd floor lobby, replacing the lights in the third floor bathrooms, and repairing a couple of emergency lights.
We have ordered material to restore the Mainstage aisle lights; replacement guts and new lenses. These will be installed by Tony's crew.
Chris will be picking up replacement fixtures for the Balcony Theater halogen work lights; Tony's crew will install these, as well.
The ballasts in the broken costume shop will be replaced during this work phase.
Work on the terrazzo in the foyer and restrooms will start on Monday. This is mostly buffing and polishing, but will take three days.
The carpet on the third floor will be cleaned this week; the main lobby and Mainstage will be cleaned the Monday of opening week.
2007/09/18